Bangkok: “Phradon” has expressed concerns that the Bhumibol Dam will reach its full capacity within two days, prompting the acceleration of water release into the Chao Phraya River. Measures are being implemented to monitor water inflow into Bangkok, alongside preparations to “eject houses” in areas prone to repeated flooding.
According to Thai News Agency, Mr. Paradorn Prisananantakul, Minister to the Prime Minister’s Office, disclosed after a water situation monitoring meeting that Bhumibol Dam’s capacity is nearing its limit, necessitating urgent action. The current water discharge rate stands at 45-48 million cubic meters per day, against an average daily inflow of 90 million cubic meters. Consequently, Mr. Prisananantakul has ordered the Royal Irrigation Department to manage the situation by reducing water discharge from the Sirikit Dam by 5 million cubic meters per day. Additionally, the Chao Phraya River’s water discharge will be increased to the western and eastern plains from 500 to 650 cubic meters per second to prevent the river from surpassing critical levels.
The government is actively monitoring the situation in response to public demands for expedited water drainage and is in the process of identifying relief measures. Some relief funds have already been approved by the Cabinet, with more to be sanctioned in the upcoming round. The government emphasizes that water delivery to fields must be conducted appropriately, ensuring minimal impact on residents in temporary water storage areas.
For long-term relief, the government is considering the “Dee Baan” project in recurring flood-affected areas, particularly in Phra Nakhon Si Ayutthaya and Ang Thong provinces. This includes the districts of Bang Ban, Bang Sai, Phak Hai, Sena, and Pa Mok. The project aims to support residents enduring flooding for up to two to three months annually. The government assures it will prevent the situation from escalating to affect Bangkok.