People flocked to receive a long holiday. Mittraphap road, heavy traffic jam

a long holiday for 6 days. The atmosphere of the journey back to the homeland is bustling. Mittraphap Road, inbound to downtown, Nakhon Ratchasima Province, all traffic lanes are full, accumulating more than 3 kilometers long.

The cause of the traffic jam came from the closure of the main road under the U-turn bridge. to improve the traffic surface and lay down drains The distance is longer than 1 kilometer, making all kinds of cars Both large trucks and general cars Able to run in parallel lanes, only 2 lanes, each car takes more than 30 minutes to pass through this critical point. At the time of reporting the situation, there were no police officers or related agencies to facilitate the traffic. Expected from the evening to the evening, the traffic condition at this point will have a long accumulated traffic congestion.

Petchkasem Road, the main route to the south, is crowded with traffic

As for Petchkasem Road No. 4, it is the only main route that goes up and down to the 14 southern provinces, especially Pranburi District, which is the gateway to the South. set morning-afternoon There is a volume of cars running into the south, mostly passenger cars. non-routine van And a lot of trucks when arriving at Pranburi District, cars accumulated at the red light intersection. There are 3 points in a distance of 6 km. After passing through these 3 points, the traffic will be convenient.

route to avoid traffic jams The first route from Cha-am district, heading south. At the Nong Phai Intersection, at km. 39+170, turn left onto Route 4030, go straight for 1.2 km. Turn right at the intersection, go straight on Route 2004, go straight for 7.5 km., then take the bypass road. Cha-am-Pranburi at km. 46

People use public transportation to get a long holiday for 6 days .

public service vehicle From July 28th to August 2nd, the bus station organized 6,788 round trips to facilitate the public, serving more than 100,000 passengers, of which more than 59,000 were traveling on trips. It was found that the number of service users was higher than expected. The bus station brought non-fixed buses to run on various routes and ensured that it could drain passengers on long routes. In the area of Mo Chit 2 Station, it has run out before 10:00 p.m. today.

Source: Thai News Agency